Office Fit-Out at Heritage Place

  • Date Completed: July 2018
  • Client: Cundall Johnston & Partners
  • Project Type : Site Supervision & Witnessing of Commissioning Tests

About this Project

The project is a fit-out of 8th Floor of Heritage Place building situated along Kingsway Road, Ikoyi. The existing HVAC ductwork and electrical power distribution systems were redesigned to suit the tenant’s requirements. A smoke detection system with voice-alarm was designed for life safety while a fully-integrated security systems comprising of access control and CCTV systems was provided.
All existing lighting fixtures was replaced with energy efficient LED types which incorporated infra-red occupancy sensors to save energy. HVAC system was integrated with the building management system. The sanitary fixtures were replaced with modern fixtures to match interior decor and incorporated water-saving fixtures. The project was completed and commissioned in July 2018.

Contact Us





    This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

    2nd Floor, 203 Igbosere Road, Lagos Island. Lagos, Nigeria.

    +234 807 717 3834

    +234 817 300 4209

    info@abboteng.com.ng